Project Scheduling and Controlling using Primevera Public Class

Saturday, October 24 2009 | 5:30 AM (Sri Lanka Standard Time)

The class is over

Price:
Free
Duration:
60 minutes

View Recording

System & Device Check

About the Class

This class would discuss:

  • Time management principles
  • PERT
  • Critical Path
  • Network Diagrams
  • Introduction to Primevera Sure Trak Project Manager

Language of instruction:

Keywords: project management, primevera, project scheduling and controlling, pert, critical path method, network diagrams, primevera sure trak project manager, time management

Attendees in the class (1)

Comments

About Premaratne Wickramarachchi
(Teacher)

  • Premaratne Wickramarachchi
    Premaratne Wickramarachchi
  • 105 Followers
  • 24 Members recommend
  • 167 Classes conducted
  • 2 Tests created
  • 2 Tutorials added

Profile Summary

Hi,I m Premaratne Wickramarachchi, an engineering graduate who passed out from University of Moratuwa. Although currently I m working as a project manager, teaching is the my passion. I conducted face to face physics classes before becoming online lecturer.
I m a civil engineer who has been practicing structural designs for more than 5 years.
I have been working as a project manager for last 3 years who has been practicing project management.
and also I have been lecturing AutoCAD in highly reputed institutes since 2002. Further, I have been teaching mathematics for NCC,BIT courses.Recently I started face to face classes for General English.