Project Scheduling and Controlling Public Class

Friday, September 25 2009 | 5:00 AM (Sri Lanka Standard Time)

The class is over

Price:
Free
Duration:
60 minutes

View Recording

System & Device Check

About the Class

This class would discuss

  • Time management principles
  • WBS, PERT, Critical path etc.
  • How to use Primevera Sure Trak Project manager for scheduling and controlling
  • Defining activities, adding WBS, assigning resources etc.

Language of instruction:

Keywords: project management, pert, primevera sure trak, project manager, time management principles

Attendees in the class (1)

Comments

About Premaratne Wickramarachchi
(Teacher)

  • Premaratne Wickramarachchi
    Premaratne Wickramarachchi
  • 105 Followers
  • 24 Members recommend
  • 167 Classes conducted
  • 2 Tests created
  • 2 Tutorials added

Profile Summary

Hi,I m Premaratne Wickramarachchi, an engineering graduate who passed out from University of Moratuwa. Although currently I m working as a project manager, teaching is the my passion. I conducted face to face physics classes before becoming online lecturer.
I m a civil engineer who has been practicing structural designs for more than 5 years.
I have been working as a project manager for last 3 years who has been practicing project management.
and also I have been lecturing AutoCAD in highly reputed institutes since 2002. Further, I have been teaching mathematics for NCC,BIT courses.Recently I started face to face classes for General English.